Return
Print
Email
FLEXTIME IMPACT-LARGE<span class=' ItemWarning' style='display:block;'>Item is usually in stock, but we&#39;ll be in touch if there&#39;s a problem<br /></span>

FLEXTIME IMPACT-LARGEItem is usually in stock, but we'll be in touch if there's a problem
by Watson Gloves

About this Item:

Dryhide™ water resistant full-grain goatskin leather palm is hard wearing and durable providing great dexterity. Heavy duty rubber on back of hand, fingers and knuckle bar provides impact protection. Hooded fingertips and thumb for added reinforcement and protection in critical wear areas. Spandex stretch back is flexible and provides form-fitting memory. Touchscreen compatible fingertips can be used on all touch screen devices. Snug-fitting elastic wrist and secure Velcro® closure keeps out dirt and debris.

$
23
55
/ 1
  • Part Number: 005TPR-L
  • UPC:
  • Available quantity online:
  • Available quantity in store:
Quantity:
Add To Cart
Add To Estimate
Add To Wishlist
Compare Item
Product Variations (2)
Product Overview
Info & Guides
Specifications
Details
Industrial Category:
Industrial Subcategory:
Industrial Subtype:
Synthetic Gloves
Applications:
Automotive, Construction, Equestrian, Gardening & Landscaping, General Purpose
Back Material:
Spandex with TPR
Brand:
Work Armour
Closure Type:
Velcro®
Colour:
Black/Tan
GTIN:
065537865157
Item Height inches:
1
Item Length inches:
9
Item Quantity:
1
Item Weight lbs:
0.45
Item Width inches:
4
Package Height inches:
13.4
Package Length inches:
25.6
Package Quantity:
72
Package Type:
BOX
Package Weight lbs:
32.4
Package Width inches:
13.4
Palm Material:
Goatskin
Product Series:
Work Armour
Short Description:
Dryhide™ water resistant full-grain goatskin leather palm is hard wearing and durable providing great dexterity Spandex stretch back is flexible and provides form-fitting memoryLeather hooded fingertips and reinforced thumb.
Size:
L
Spec Sheet:
https://www.watsongloves.com/wp-content/uploads/2019/07/005TPR-Flextime_Spec-Sheet_NP.pdf
Thumb Type:
Wing
UNSPSC:
46181504
UNSPSC Number:
46181504
Manufactured By:
Watson Gloves
Other Details
Dryhide™ water resistant full-grain goatskin leather palm
Heavy duty rubber on back of hand, fingers and knucle bar
Hooded fingertips and thumb
Snug-fitting elastic wrist
Spandex stretch back
Recently Viewed Items
To: From: Subject:

© 1959-2022 Raider Hansen, a division of Cascade Raider Holdings Ltd.

Website Development by XOLOGIC